Matte-black solar panels covering the flat roof of a modern residence at dusk, warm light inside

Latur, Maharashtra · Locally run, end to end

Where
power
meets purpose

Solar generation, electrical contracting, industrial installations and lighting — designed as one system, by one team, in Latur.

01 / The thesis

Most companies sell you panels. We build the whole electrical spine of your building.

Generation, wiring, distribution, protection and light — designed together by one contractor, so nothing falls between three vendors.

03 / Numbers

What your roof is worth, before anyone visits.

Move the sliders. Every assumption behind these figures is written down below — no black box, no inflated payback.

₹3,500
600 sq ft

≈ 6.0 kW of roof capacity at 100 sq ft per kW

₹8.50

Default is the MSEDCL residential slab. Change it to your own bill's rate.

Recommended system

3.5kW

Cost before subsidy
₹2.0–2.3 lakh
PM Surya Ghar subsidy
₹78,000
Net cost after subsidy
₹1.3–1.5 lakh
Monthly saving
₹2,975Capped at 85% of your bill — fixed charges remain
Payback
3–5 years
25-year saving
about ₹13.0 lakh

25-year cumulative ROI

Net costBreak-even, yr 4Y0Y5Y10Y15Y20Y25₹13,01,596₹0
Year-by-year cumulative solar saving versus net system cost
YearCumulative savingNet system cost
0₹0₹1,25,000
1₹35,700₹1,25,000
2₹72,471₹1,25,000
3₹1,10,345₹1,25,000
4₹1,49,355₹1,25,000
5₹1,89,536₹1,25,000
6₹2,30,922₹1,25,000
7₹2,73,550₹1,25,000
8₹3,17,456₹1,25,000
9₹3,62,680₹1,25,000
10₹4,09,260₹1,25,000
11₹4,57,238₹1,25,000
12₹5,06,655₹1,25,000
13₹5,57,555₹1,25,000
14₹6,09,982₹1,25,000
15₹6,63,981₹1,25,000
16₹7,19,601₹1,25,000
17₹7,76,889₹1,25,000
18₹8,35,895₹1,25,000
19₹8,96,672₹1,25,000
20₹9,59,272₹1,25,000
21₹10,23,751₹1,25,000
22₹10,90,163₹1,25,000
23₹11,58,568₹1,25,000
24₹12,29,025₹1,25,000
25₹13,01,596₹1,25,000

How the subsidy is built up

  • First 2 kW × ₹30,000₹60,000
  • Next 1 kW × ₹18,000₹18,000
  • Above 3 kW₹0

₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW, hard cap ₹78,000. A 5 kW or 10 kW system still receives ₹78,000 — not more.

04 / Subsidy

PM Surya Ghar, without the paperwork headache.

The central rooftop subsidy is credited to your bank account after installation and inspection. We register the application, coordinate the DISCOM net-metering, and follow the file until the money lands.

  1. 01National portal registration and consumer details
  2. 02Vendor selection, feasibility approval and net-meter application
  3. 03Installation, DISCOM inspection and commissioning report
  4. 04Subsidy claim submission and bank credit follow-up

Central subsidy by system size

Up to 1 kW
₹30,000
2 kW
₹60,000
3 kW and above
₹78,000

Slabs shown as published under the PM Surya Ghar Muft Bijli Yojana. Rates and eligibility change — we confirm the current figure in writing before you pay anything.

05 / Process

Four steps, in this order, every time.

  1. 01

    Site survey

    We measure the roof, log shading through the day, check your existing board, earthing and load pattern.

  2. 02

    Design & quote

    Load-calculated sizing, a single-line diagram and an itemised bill of materials. Brand and rating of every component named.

  3. 03

    Installation & liaisoning

    Our own team executes. We handle DISCOM net-metering, inspection and the subsidy file in parallel.

  4. 04

    AMC & monitoring

    Generation checks, panel cleaning schedule, thermal inspection of the board, and a number that actually answers.

06 / Why us

The reasons that survive a site visit.

One contractor, not three

Solar, wiring and lighting from the same team — no coordination gaps, no blame between vendors when something trips.

IS-standard workmanship

Correctly rated MCB/RCCB, proper terminations, tested earthing — the parts nobody photographs.

Load-calculated design

System size follows your actual consumption and future load, not a round number that sells easily.

Local Latur team

We live here. A fault call does not become a week of waiting for a city crew.

Post-install AMC

Cleaning, generation review and board inspection on a schedule, with response commitments in writing.

Transparent BOM

Every panel, inverter, cable and breaker named with make and rating in the quote itself.

07 / Work

Projects across Latur and Marathwada.

We only publish our own sites. Photography from recent installations is being collected — no stock imagery stands in for it.

Project photography from our current installations is being added this month. Ask us for site references in the meantime — we'll share them on WhatsApp.

Proprietor

Shailesh
Deshmukh

Runs every survey. Signs off every board.

04
Trades under one roof
Every one
Surveys attended
Latur
Base
≤ 1 day
Quote to site visit

08 / The person responsible

“I started SunShail because too many homes get good panels on bad wiring.”

Shailesh Deshmukh is on site for the survey, the board build and the handover — the same person who quotes the job is the person answerable for it.

09 / Service area

Latur district first. Marathwada on request.

LaturAusaUdgirNilangaAhmedpurChakur

10 / FAQ

Questions we get on site.

Under PM Surya Ghar the central subsidy is credited to your bank account after installation, DISCOM inspection and commissioning — typically a few weeks after the file is complete. We confirm the applicable slab in writing before you pay anything.

Net metering lets your meter run backwards when you export surplus generation, so daytime excess offsets night-time consumption. For any on-grid rooftop system it is essential, and we handle the DISCOM application and meter change.

Generation drops on heavily overcast days but does not stop. We size annually, so surplus in the dry months carries your monsoon shortfall through net metering rather than leaving you short.

Only after the wiring and board are assessed. We do a load calculation and check terminations, breaker ratings and earthing first — adding generation to unsafe wiring is how equipment gets damaged.

Earthing is what carries a fault current away from a person. Inverters and panels also need proper earthing for surge protection. We install and test earthing pits rather than assuming what is already there works.

Scheduled panel cleaning, generation review against expected yield, inverter fault log check, and thermal inspection of the distribution board with a written report. Scope and response times are fixed in the contract.

Staged against milestones — advance on order, balance on material delivery and commissioning. The itemised bill of materials is attached to the quote so you know exactly what each stage buys.

A typical residential rooftop takes two to four days on site once material arrives; DISCOM inspection and subsidy processing run in parallel afterwards. Industrial work is scheduled around your shutdown window.

Credentials

Registered, licensed, and quoting only subsidy-eligible hardware.

ALMM compliance. We quote only ALMM-listed panels and inverters, so your subsidy file cannot be rejected on hardware. Make, model and list reference go into the quote before you pay anything.

Licence, GST and Udyam registration numbers are shared with every quotation and on request over WhatsApp or a call.

Service area

Latur city and the surrounding taluka — Ausa, Udgir, Nilanga, Ahmedpur and Chakur. Surveys are free within the district.

Office pin: Latur, Maharashtra, India. The exact plot pin follows Google Business Profile verification.

11 / Next step

A free survey, then honest numbers.

Tell us where you are and what you need. We come, we measure, and we quote what the building actually requires.

+91 78881 58812 · Latur, Maharashtra, India

Enquiry

Book a site visit

+91
What do you need?

We'll WhatsApp you within one working day. No call centre, no spam.